To the top of the document
Orlando
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Front Compartment Insulator Replacement


2027192

Callout

Component Name

Preliminary Procedure

Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle .

1

Front Compartment Insulator Screw (Qty: 8)

Caution : Refer to Fastener Caution in the Preface section.

Tighten
3 N·m (27 lb in)

2

Front Compartment Insulator Plastic Retainer (Qty: 5)

3

Front Compartment Insulator

   


© Copyright Chevrolet. All rights reserved
   


© Copyright Chevrolet. All rights reserved