To the top of the document
Orlando
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Positive Crankcase Ventilation Hose/Pipe/Tube Replacement - 1.6L LDE, LXV, 1.8L 2H0, LUW and LFH

Removal Procedure

  1. Open the bonnet.

  2. 2027614
  3. Unclip the ECM wiring harness guide (3) from the cylinder head cover.
  4. Disconnect the 2 positive crankcase ventilation tube connectors (1).
  5. Remove the positive crankcase ventilation tube (2).

Installation Procedure


    2027614
  1. Install the positive crankcase ventilation tube (2).
  2. Connect the 2 positive crankcase ventilation tube connectors (1).
  3. Clip in the ECM wiring harness guide (3) to the cylinder head cover.
  4. Close the bonnet.
   


© Copyright Chevrolet. All rights reserved
   


© Copyright Chevrolet. All rights reserved