Orlando
Engine Oil Cooler Housing Installation - LDE, LED, LFJ, LXV, 2H0, LUW, LFH
Clean the engine oil cooler housing to thermostat housing sealing surfaces.
Install 2 NEW gaskets.
Install the engine oil cooler inlet pipe (3).
Install the engine oil cooler housing (1) and the 5 engine oil cooler bolts (2) and tighten to
25 N·m (18 lb ft)
.
Install the thermostat housing coolant pipe (2) to the engine oil cooler housing.
Install the 2 thermostat housing coolant pipe bolts (1) and tighten to
8 N·m (71 lb in)
.
© Copyright Chevrolet. All rights reserved
© Copyright Chevrolet. All rights reserved