Orlando |
||||||||
|
|
Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Instrument Panel Tie Bar Fastener (Qty: 6) Caution: Refer to Fastener Caution in the Preface section. Tighten |
2 | Air Conditioning Evaporator and Blower Module Fastener (Qty: 2) Tighten: |
3 | Instrument Panel Tie Bar Procedure
|
© Copyright Chevrolet. All rights reserved |
© Copyright Chevrolet. All rights reserved |