To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Inlet Manifold Installation - 1.8L 2H0

  1. Clean the sealing surfaces.
  2. Insert 4 NEW gaskets.
  3. Caution: Refer to Fastener Caution in the Preface section.


    2026541
  4. Install the intake manifold and the 7 bolts (1) and tighten to 20N·m (15 lb ft).

  5. 2026538
  6. Install the intake manifold support (1) and the 2 intake manifold support bolts (2, 3) and tighten to 8N·m (71 lb in).
   


© Copyright Chevrolet. All rights reserved