To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Turbocharger Installation


    2027658

    Note: Ensure that the turbocharger surface and the exhaust manifold surface are clear of old gasket material and rust.

  1. Install a NEW turbocharger gasket (3).
  2. Install the turbocharger (2).
  3. Caution: Refer to Fastener Caution in the Preface section.

    Caution: Refer to Torque-to-Yield Fastener Caution in the Preface section.

  4. Install 2 NEW turbocharger lower nuts (4) and tighten to 34 N·m (26 lb ft).
  5. Install the NEW turbocharger upper nut (1) and tighten to 34 N·m (26 lb ft).
   


© Copyright Chevrolet. All rights reserved