Camshaft Cover Installation
- Clean the sealing surfaces.
Note: The thickness of the sealing bead should be 2 mm (0.0787 in).
- Apply sealing compound to areas (1) and (2). Refer to Adhesives, Fluids, Lubricants, and Sealers .
Note: The installation procedure should not take longer than 10 minutes.
- Install the camshaft cover (2) and a NEW gasket (3).
- Install the 15 camshaft cover bolts (1).
- Tighten the 15 camshaft cover bolts in a sequence as shown to 8 N·m (71 lb in).
- Install the oil level indicator (1).
© Copyright Chevrolet. All rights reserved |