To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Positive Crankcase Ventilation Pipe Removal


    2190425
  1. Open the 2 positive crankcase ventilation pipe retainer clips (2) and (3).
  2. Note: Move retainer clamp (1) in direction of the arrow.

  3. Remove the positive crankcase ventilation pipe from the intake manifold.

  4. 2190426
  5. Loosen the charger air bypass valve pipe clamp (4).
  6. Remove the charger air bypass valve pipe from turbocharger.
  7. Remove the charger air bypass valve pipe (2) from turbo charger waste regulator solenoid valve.
  8. Disconnect the positive crankcase ventilation pipe from turbocharger (3).
  9. Unclip and remove the positive crankcase ventilation pipe assembly (1) from the camshaft cover retainer clips.
   


© Copyright Chevrolet. All rights reserved