- Clean the sealing surfaces.
- Replace the connect fittings on the turbocharger coolant feed pipe and the turbocharger coolant return pipe. Refer to Turbocharger Disassemble and Turbocharger Assemble .
Note: Mind the turbocharger oil return pipe.
- Install the turbocharger assembly (1) and a NEW turbocharger gasket (2).
- Connect the turbocharger oil return pipe to the engine while installing the turbocharger.
- Install the turbocharger coolant feed pipe banjo bolt along with 2 NEW seal rings (1) and (2).
- Install the 8 NEW turbocharger nuts (1).
Caution: Refer to Fastener Caution in the Preface section.
Caution: Refer to Torque-to-Yield Fastener Caution in the Preface section.
- Tighten the 8 turbocharger nuts in a sequence as shown to 8 N·m (71 lb in).
- Repeat the tightening procedure to ensure a proper fastening of the turbocharger nuts.
- Connect the turbocharger coolant return hose (6) to the oil cooler coolant inlet pipe and install the turbocharger coolant return pipe bolt (7) to the oil cooler. Tighten the turbocharger coolant return pipe bolt to 8 N·m (71 lb in).
- Install the turbocharger oil feed pipe (2) along with a NEW rubber seal ring.
- Install the turbocharger oil feed pipe hollow screw (4) in compound with 2 NEW seal rings (1) and (3).
- Install the turbocharger oil feed pipe bolt (5) to the oil cooler and tighten to 10 N·m (89 lb in).
- Tighten the turbocharger oil feed pipe hollow screw to 30 N·m (22 lb ft).
Note: The EN-49942 holding spanner (2) should be installed to turbocharger coolant feed pipe as shown. The holding spanner should be installed to avoid twisting the turbocharger coolant feed pipe during the fastening procedure.
- Install the EN-49942 holding wrench (2) to the turbocharger coolant feed pipe. Guide a ratchet spanner (1) along with an extension through EN-49942 holding spanner to the turbocharger coolant feed pipe hollow screw.
Note: EN-49942 holding wrench (2) should be installed to turbocharger coolant feed pipe as shown. The holding spanner should be installed to avoid twisting the turbocharger coolant feed pipe while the fastening procedure.
- Tighten the turbocharger coolant feed pipe banjo bolt with socket spanner and extension (1) to 30 N·m (22 lb ft).