To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Engine Front Cover Installation

  1. Clean the sealing surfaces.

  2. 2373290

    Note: The complete installation procedure of the camshaft guide should be done in 10 minutes.

    Note: Do not coat sealing compound on the engine front cover bolt holes and bolt threads.

  3. Apply sealing compound on sealant line (1).

  4. 2373202
  5. Install the engine front cover (1).
  6. Caution: Refer to Fastener Caution in the Preface section.

  7. Install the 13 engine front cover retaining bolts (M8) (3) and tighten evenly to 22 N·m (16 lb ft).
  8. Install the 3 engine cover retaining bolts (M6) (2) and tighten to 9 N·m (80 lb in).
   


© Copyright Chevrolet. All rights reserved