To the top of the document
Orlando
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Drive and Driven Sprocket, Drive Link, and Park Pawl Installation - 6T40/45/50


1891417

Callout

Component Name

1

Front Differential Carrier Baffle

2

Front Differential Carrier Baffle Bolt M6 x 16 (Qty: 2)

Caution: Refer to Fastener Caution in the Preface section.

Tighten
12 N·m (106 lb in)

3

Drive Link Lube Scoop Seal

4

Drive Link Lube Fluid Seal

5

Drive Link Lube Scoop

6

Driven Sprocket Bearing Assembly

7

Drive Sprocket Bearing Assembly

8

Driven Sprocket Assembly, Drive Sprocket Assembly and Drive Link

Tip

    • Install the drive link with the coloured links and/or part number facing up.
    • The drive link, drive, and driven sprocket assemblies must be installed at the same time.
    • The ball bearing should spin freely and smoothly.
    • The driven sprocket ball bearing inner race has a slight interference fit with the case. Tap gently with the palm of a hand or a soft tip hammer to install.

9

Park Pawl

10

Park Pawl Spring

11

Park Pawl Shaft

Tip
Check to ensure that the park pawl operates freely and is not binding.

   


© Copyright Chevrolet. All rights reserved
   


© Copyright Chevrolet. All rights reserved