To the top of the document
Orlando
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Inlet Manifold Assemble - 1.8L 2H0


    2189147
  1. Install the 4 NEW multiport fuel injector seals (4).
  2. Install the multiport fuel injection fuel rail (2) and the fuel injectors (3) to the intake manifold (5).
  3. Caution: Refer to Fastener Caution in the Preface section.

  4. Install the 2 multiport fuel injection fuel rail bolts (1) and tighten to 8 N·m (71 lb in).

  5. 2189146
  6. Install the evaporative emission canister purge solenoid valve and bracket (2) to the intake manifold (3).
  7. Install the 2 evaporative emission canister purge solenoid valve bracket bolts (1) and tighten to 7 N·m (62 lb in).

  8. 2189145
  9. Install the NEW intake manifold seal (3) to the intake manifold (2).
  10. Install the NEW throttle body seal (1).

  11. 2189144
  12. Install the intake manifold mount (2) to the intake manifold (1) and tighten to 8 N·m (71 lb in).

  13. 2189143
  14. Install the manifold absolute pressure sensor (2) to the intake manifold (3).
  15. Install the intake manifold absolute pressure sensor bolt (1) and tighten to 6 N·m (54 lb in).
   


© Copyright Chevrolet. All rights reserved
   


© Copyright Chevrolet. All rights reserved