Note:
• | Before assembly, wash all the components thoroughly. |
• | Apply ATF to all of the components and holes. |
• | Do not use components which may have been dropped. |
• | With plastic tape, tape the screwdrivers and rods to be used for inserting the valve. |
• | Note the orientation of valves and plugs. |
- Install the pilot valve (4).
- Install the pressure regulator valve (5).
- Install the accumulator control valve (6).
- Install the shift valve B (7).
- Install the servo release timing valve (8).
- Install the lock-up control valve (3).
- Install the neutral control valve (2).
- Install the 1-2 modulator valve (1).