To the top of the document
Spark
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Generator Installation


    2547221
  1. Install the alternator (1) to the alternator bracket (2).
  2. Caution: Refer to Fastener Caution in the Preface section.

  3. Install the 2 lower alternator bolts (3) and tighten to 22 N·m (16 lb ft).
  4. Install the upper alternator bolt (4) and tighten to 22 N·m (16 lb ft).
   


© Copyright Chevrolet. All rights reserved