To the top of the document
Orlando
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Turbocharger Coolant Feed Pipe Installation


    2373124
  1. Install the turbocharger coolant feed pipe (1) and NEW gaskets (2).
  2. Caution: Refer to Fastener Caution in the Preface section.

  3. Install the 2 banjo bolts (3) to the turbocharger coolant feed pipe (1) and tighten to 32 N·m (24 lb ft).

  4. 2373123
  5. Install the turbocharger bracket (2).
  6. Install the 2 turbocharger bracket bolts (1) to the turbocharger bracket (2) and tighten to 25 N·m (18 lb ft).
   


© Copyright Chevrolet. All rights reserved