Cruze
Turbocharger Oil Feed Pipe Replacement
Removal Procedure
Open the bonnet.
Disconnect battery negative cable. Refer to
Battery Negative Cable Disconnection and Connection
.
Remove the exhaust manifold heat shield. Refer to
Exhaust Manifold Heat Shield Replacement
:
2.0L Diesel LNP
→
1.4L LUH and LUJ
→
1.6L LDE, LXV, 1.8L 2H0, and LUW
→
2.0L Diesel LLW
.
Remove the turbocharger oil feed pipe bolt (5).
Remove the turbocharger oil feed pipe hollow screw (4) and the 2 seal rings (1) and (3).
Remove the turbocharger oil feed pipe (2) and the rubber seal ring.
Installation Procedure
Clean the sealing surfaces.
Install the turbocharger oil feed pipe (2) along with a NEW rubber seal ring.
Install the turbocharger oil feed pipe hollow screw (4) and 2 NEW seal rings (1) and (3).
Caution:
Refer to
Fastener Caution
in the Preface section.
Install the turbocharger oil feed pipe bolt (5) and tighten to
10 N·m (89 lb in)
.
Tighten the turbocharger oil feed pipe hollow screw to
30 N·m (22 lb ft)
.
Install the exhaust manifold heat shield. Refer to
Exhaust Manifold Heat Shield Replacement
:
2.0L Diesel LNP
→
1.4L LUH and LUJ
→
1.6L LDE, LXV, 1.8L 2H0, and LUW
→
2.0L Diesel LLW
.
Connect battery negative cable. Refer to
Battery Negative Cable Disconnection and Connection
.
Close the bonnet.
© Copyright Chevrolet. All rights reserved