- Install the throttle body assembly (2) along with a NEW gasket (1).
Caution: Refer to Fastener Caution in the Preface section.
- Install 4 throttle body assembly bolts (3) and tighten to 10 N·m (89 lb in).
Note: Ensure that the retaining ring (1) is locked.
- Install the charge air cooler outlet rear hose (2) to the throttle body (3).
- Clip in the 2 wiring harness retaining clips to the charge air cooler outlet rear hose (2).
- Install the charge air cooler outlet front hose (1) along with the clamp (4) to the charge air cooler outlet rear hose (3).
Caution: Refer to Fastener Caution in the Preface section.
- Install the charge air cooler outlet front hose bracket bolt (2) and tighten to 9 N·m (80 lb in).
- Tighten the clamp (4) to 4 N·m (35 lb in).
- Clip in the engine wiring harness retaining clip to the charge air cooler outlet front hose.
- Install the radiator surge tank. Refer to Radiator Surge Tank Replacement .
- Clip in the transmission vent hose to the charge air cooler outlet front hose.
- For vehicles with MT: Connect the transmission gear lever and selector cable to the transmission. Refer to Manual Gearbox Gear Lever and Selector Lever Cable Replacement .
For vehicles with AT: Connect the range selector lever cable to the automatic transmission. Refer to Range Selector Lever Cable Replacement .
- Install the engine sight shield. Refer to Engine Sight Shield Replacement .
- Install the battery tray. Refer to Battery Tray Replacement .
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .