To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Vacuum Pump Hose Replacement

Removal Procedure

  1. Remove the engine sight shield. Refer to Engine Sight Shield Replacement .

  2. 2511794
  3. Remove the vacuum pump hose (2) from the vacuum pump (1).
  4. Remove the vacuum pump hose from the 2 vacuum pump hose clips (3).

  5. 2511795
  6. Remove the wiring harness conduit (1) in top direction from the 3 exhaust gas recirculation cooler brackets. Hang the wiring harness conduit aside.
  7. Remove the vacuum pump hose (3) from the exhaust gas recirculation valve cooler bypass control solenoid valve (5).
  8. Remove the 3 vacuum pump hose clips (2).
  9. Remove the vacuum pump hose (3) from the charge air bypass valve vacuum tank (4).

Installation Procedure


    2511795
  1. Install the vacuum pump hose (3) to the charge air bypass valve vacuum tank (4).
  2. Install the 3 vacuum pump hose clips (2).
  3. Install the vacuum pump hose (3) to the exhaust gas recirculation valve cooler bypass control solenoid valve (5).
  4. Install the wiring harness conduit (1) to the 3 exhaust gas recirculation cooler brackets.

  5. 2511794
  6. Install the vacuum pump hose to the 2 vacuum pump hose clips (3).
  7. Install the vacuum pump hose (2) to the vacuum pump (1).
  8. Install the engine sight shield. Refer to Engine Sight Shield Replacement .
   


© Copyright Chevrolet. All rights reserved