To the top of the document
Cruze
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Air Conditioning Evaporator Core Replacement

Removal Procedure

  1. Remove instrument panel assembly. Refer to Instrument Panel Assembly Replacement .

  2. 2027818
  3. Remove instrument panel wiring harness (2) from instrument panel tie bar (1).
  4. Disconnect electrical connectors.


    2027821
  5. Remove instrument panel tie bar (2).
  6. 3.1. Remove 4 instrument panel tie bar bolts (3, 4).
    3.2. Remove 2 instrument panel tie bar nuts (1).

    2189440
  7. Remove air conditioning module wiring harness (1).
  8. Disconnect electrical connectors.

  9. Remove heater core. Refer to Heater Core Replacement .
  10. Remove blower motor. Refer to Blower Motor Replacement .
  11. Remove heater and blower and air conditioning control module. Refer to Heater and Blower and Air Conditioning Control Module Replacement or Heater and Blower and Air Conditioning Control Module Replacement .
  12. Recover the refrigerant. Refer to Refrigerant Recovery and Recharging .

  13. 2027829
  14. Remove heater and air conditioning evaporator case (2) from heater and blower and air conditioning control module (1).
  15. Remove 10 heater and air conditioning evaporator case bolts (3).
  16. Remove air conditioning evaporator core from heater and blower and air conditioning control module.

Installation Procedure

  1. Install air conditioning evaporator core to heater and blower and air conditioning control module.

  2. 2027829
  3. Install heater and air conditioning evaporator case (2) to heater and blower and air conditioning control module (1).
  4. Caution: Refer to Fastener Caution in the Preface section.

  5. Install 10 heater and air conditioning evaporator case bolts (3) and tighten to 2.5 N·m (22 lb in).
  6. Refrigerant recovery and recharging. Refer to Refrigerant Recovery and Recharging .
  7. Install heater and blower and air conditioning control module. Refer to Heater and Blower and Air Conditioning Control Module Replacement or Heater and Blower and Air Conditioning Control Module Replacement .
  8. Install blower motor. Refer to Blower Motor Replacement .
  9. Install heater core. Refer to Heater Core Replacement .

  10. 2189440
  11. Install air conditioning module wiring harness (1).
  12. Connect electrical connectors.


    2027821
  13. Install instrument panel tie bar (2).
  14. 9.1. Install 4 instrument panel tie bar bolts (3, 4) and tighten to 22 N·m (17 lb ft).
    9.2. Install 2 instrument panel tie bar nuts (1) and tighten to 6 N·m (53 lb in).

    2027818
  15. Install instrument panel wiring harness (2) from instrument panel tie bar (1).
  16. Connect electrical connectors.

  17. Install instrument panel assembly. Refer to Instrument Panel Assembly Replacement .
   


© Copyright Chevrolet. All rights reserved