Volt |
||||||||
|
|
Callout | Component Name |
---|---|
Preliminary Procedure
| |
1 | Front Stabiliser Shaft Nut (Qty: 2) Caution: Refer to Fastener Caution in the Preface section. Procedure
Tighten |
2 | Front Stabiliser Shaft Link Caution: This component is equipped with torque-to-yield fasteners. Install a NEW torque-to-yield fastener when installing this component. Failure to replace the torque-to-yield fastener could cause damage to the vehicle or component. |
© Copyright Chevrolet. All rights reserved |