To the top of the document
Volt
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Evaporative Emission Canister Vent Solenoid Valve Replacement


2440827

Callout

Component Name

Danger: Do not use a service jack in locations other than those specified to lift this vehicle. Lifting the vehicle with a jack in those other locations could cause the vehicle to slip off the jack and roll; this could cause injury or death.

Preliminary Procedure

  1. Remove the rear underbody air deflector. Refer to Underbody Rear Air Deflector Replacement .
  2. Lower the canister bracket to gain access to the vent solenoid valve.

1

Evaporative Emission Vent Solenoid Valve Fastener (Qty: 2)

Caution: Refer to Fastener Caution in the Preface section.

Tighten
7 N·m(62 lb in)

2

Evaporative Emission Vent Solenoid Valve

Procedure

  1. Disconnect the evaporative emission connectors. Refer to Plastic Collar Quick Connect Fitting Service .
  2. Disconnect the electrical connector.
   


© Copyright Chevrolet. All rights reserved