Volt |
||||||||
|
|
Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Front Side Door Upper Hinge to Body Bolts (Qty: 2) Caution : Refer to Fastener Caution in the Preface section. Tighten |
2 | Front Side Door Upper Hinge to Door Bolts (Qty: 2) Tighten |
3 | Front Side Door Upper Hinge |
4 | Front Side Door Lower Hinge to Body Bolts (Qty: 2) ProcedureFront side door check link bolt. Refer to upper front hinge removal. Tighten |
5 | Front Side Door Lower Hinge to Door Bolts (Qty: 2) Tighten |
6 | Front Side Door Lower Hinge ProcedureInspect the door for proper operation and alignment. Refer to Front Side Door Adjustment . |
© Copyright Chevrolet. All rights reserved |