Volt |
||||||||
|
|
Callout | Component Name | ||||||
---|---|---|---|---|---|---|---|
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure will perform the following tasks:
Preliminary Procedure
| |||||||
1 | Heater Coolant Heater Nuts (Qty: 5) Caution: Refer to Fastener Caution in the Preface section. Tighten | ||||||
2 | Heater Coolant Heater Note: Replace corroded hose clamps and brackets. |
©© Copyright Chevrolet. All rights reserved |