- Assemble the turbocharger. Refer to Turbocharger Assemble .
Note: Ensure that the turbocharger surface and the exhaust manifold surface are clear of old gasket material and rust.
- Install a NEW turbocharger gasket (3).
- Install the turbocharger (2).
Caution: Refer to Fastener Caution in the Preface section.
Caution: Refer to Torque-to-Yield Fastener Caution in the Preface section.
- Install 2 NEW turbocharger lower nuts (4) and tighten to 34 N·m (26 lb ft).
- Install the NEW turbocharger upper (1) nut and tighten to 34 N·m (26 lb ft).
- Raise the vehicle by its full height. Refer to Lifting and Jacking the Vehicle .
- Install the turbocharger oil return hose (3).
- Install the 2 turbocharger oil return hose clamps (1, 2).
- Install the charge air cooler inlet air tube (2).
- Install the 3 charge air cooler inlet air tube bolts (1) and tighten to 10 N·m (89 lb in).
- Install the 2 hose clamps (3).
- Install the charge air cooler inlet air tube bolt (4) and tighten to 10 N·m (89 lb in).
- Install the turbocharger oil feed pipe (4).
- Install NEW turbocharger oil feed pipe bolt gaskets (2).
- Install the turbocharger oil feed pipe bolt (3) and tighten to 23 N·m (17 lb ft).
- Lower the vehicle by its full height. Refer to Lifting and Jacking the Vehicle .
- Install NEW turbocharger oil feed pipe bolt gaskets (5).
- Install the turbocharger oil feed pipe bolt (1) and tighten to 23 N·m (17 lb ft).
- Install the catalytic converter. Refer to
Catalytic Converter Replacement : 1.4L LUH and LUJ → 1.6L LXT,L2W → 1.6L LDE, LXV, 1.8L 2H0, and LUW → 2.0L Diesel LLW .
- Install the air cleaner outlet pipe (3) to the turbocharger.
- Install the air cleaner outlet pipe clamp (2).
- Install the air cleaner outlet pipe bracket bolt (1) and tighten to 5 N·m (45 lb in).