To the top of the document
Volt
   
GMDE Start Page Load static TOC Load dynamic TOC Help?

Heater Vent Hose Replacement


2399625

Callout

Component Name

Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed.

The High Voltage Disabling procedure will perform the following tasks:

   • Identify how to disable high voltage.
   • Identify how to test for the presence of high voltage.
   • Identify conditions under which high voltage is always present and personal protection equipment (PPE) and proper procedures must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.

Preliminary Procedure

  1. Disable the high voltage system. Refer to High Voltage Disabling and High Voltage Enabling .
  2. Drain the coolant. Refer to Cooling System Draining and Filling .

1

Heater Vent Hose Clamps (Qty 2)

Procedure

Reposition the heater vent hose clamps using BO-38185 pliers

Special Tools

BO-38185 Hose Clamp Pliers

For equivalent regional tools, refer to Special Tools .

2

Heater Vent Hose

Note: Replace corroded hose clamps and brackets.

   


&#169© Copyright Chevrolet. All rights reserved